法国格伊斯通道是如何修建的?

法国格伊斯通道是如何修建的?

根据Passage du Gois上的描述

“Running almost three miles across the Bay of Bourgneuf, the Passage du Gois is built atop a narrow spine of silt that has developed over hundreds of years. Eventually the line grew big enough that it rose out of the waters during low tide, creating a land bridge across the bay.“

以及 THE PASSAGE DU GOIS - Au Passage du Gois 上的描述

“The history of the Passage du Gois

People went on foot over the sand-banks to the island of Noirmoutier. Much later they have made a paved road. In those days a lot of accidents took place on the Passage du Gois, because of the quickly rising water was underestimated. This is the reason why rescue poles have been built. Anyone who is surprised by the rapidly rising water or a breakdown of the car can climb in one of these rescue poles. The last strengthening of the causeway took place in 1924.“

以及 Passage du Goi 上的描述

“The stone paved causeway was first used during the 16th century and is still used daily by tourists and locals. At high tide the road lies under 1.5 - 4 metres of water.“

推测:先是大自然历经 N 百年形成了一道在退潮时凸出来的泥沙路[这个过程估计只能用“大自然的鬼斧神工”来描述了吧],然后人们在上面铺设了石头路以及救命用的“塔”,后来再进行了加固

标签:伊斯,修建,通道,法国,科技,建筑,土木工程,建筑施工